Little Elm Aquatic Center

Project Location: Little Elm, TX

Overview:

The town of Little Elm, part of the Dallas-Ft. Worth Metroplex, is expanding its municipal recreation facility with the addition of a 42,000 s.f. multi-story aquatic center.  The new structure includes a retractable roof enclosure for year-round fun. LTC continued its successful partnership with D&S Engineering Labs on this project.  The 30” diameter, 53’ deep augercast test pile was installed by L G Barcus and Sons.  As typical for ACIP test in Texas, a W-section carrying beam was used to position the Load Test Assembly, compression telltales and strain gage instruments into the pile, making for a quick assembly and easy pick and install.  The test results validated the design and the new aquatic center is on schedule to open in 2021.

Test assembly ready to pick
Ready to drill
Construction in full swing

Projects Home